Contract Costing Meaning, Types, Procedures, Challenges

Contract Costing, often associated with the construction industry, involves the specific tracking and accounting of costs and revenues for individual contracts. Each contract is treated as a separate cost unit and is monitored from start to finish. This method is particularly crucial when the contracts are lengthy, involve substantial costs, and are uniquely customized. Contract costing helps in determining the profitability of each contract by accumulating all expenses related to labor, materials, overheads, and also including any attributable sub-contractor charges. It also involves recognizing revenue over the life of the contract, often guided by the percentage-of-completion method, which matches revenue earned to the stages of completion, ensuring financial figures accurately reflect the progress of each contract.

Features of Contract Costing:

  • Individual Contract Account:

Each contract is treated as a separate cost unit and has its own individual contract account where all related costs are recorded.

  • Direct Attribution of Costs:

All direct costs, such as labor, materials, and equipment usage, are charged directly to the specific contract.

  • Apportionment of Overheads:

Indirect expenses are apportioned to contracts on a fair and reasonable basis, often based on the proportion of direct labor or machine hours devoted to the contract.

  • Work-in-Progress (WIP):

At any financial period end, contracts may be in different stages of completion. Costs incurred are recorded as work-in-progress until the contract is completed.

  • Percentage of Completion Method:

Revenue recognition is often done based on the percentage-of-completion method, allowing income to be recorded proportionally as the work progresses, which helps in matching revenues with expenses accurately over the duration of the contract.

  • Retention Money:

It is common for clients to retain a portion of the payment until the contract is completed to their satisfaction, ensuring quality and fulfillment of contract terms.

  • Escalation Clause:

Many contracts include an escalation clause to account for increases in materials or labor costs, protecting the contractor from significant cost fluctuations during the contract period.

  • Certification:

Payments are typically made on the basis of certificates issued either by the contractor’s surveyor or an independent certifying body, which verifies the work completed and the costs incurred up to that point.

Types of Contract Costing:

  1. Fixed Price Contract Costing:

In this type, the contractor agrees to complete the contract for a fixed sum of money. This method is often used when the scope and specifications of the project are clearly defined and risks are predictable. The contractor bears the risk of cost overruns, but there is potential for higher profit if the project is managed efficiently.

  1. Cost-Plus Contract Costing:

Under a cost-plus contract, the contractor is reimbursed for all allowable or defined costs incurred plus a certain percentage or fixed fee as profit. This type is beneficial in projects where the scope is not fully defined at the outset and is subject to change. It reduces the risk to the contractor as they are covered for costs.

  1. Target Contract Costing:

This involves setting a target cost for the contract. Both the client and contractor share any savings or overruns against the target cost according to a pre-agreed formula. Target contracts are useful in fostering collaboration between the client and contractor to keep costs under control and share the financial risk and rewards.

  1. Unit Price Contract Costing:

The contract price is determined based on a price per unit of work or output (e.g., per cubic meter of construction material used or per kilometer of road laid). This method is applicable where the quantities required for the completion of the project can vary. It provides flexibility and transparency in billing.

  1. Turnkey Contract Costing:

Often used in projects where a single contractor is responsible for the complete design and construction until the facility is ready for use (‘ready to turn the key’). The contractor has total control over the project specifics, providing an all-in-one package at a predetermined price.

  1. Incentive Contract Costing:

Combines elements of both fixed-price and cost-plus contracts, offering incentives for completing the project ahead of schedule or under budget. The incentives are designed to align the contractor’s objectives with those of the client, encouraging efficiency and cost-effectiveness.

Procedures of Contract Costing:

Contract costing involves several critical procedures designed to ensure accurate financial tracking, management, and reporting for long-term, large-scale projects typically seen in industries such as construction, engineering, and large equipment manufacturing.

  1. Contract Review and Approval:

Before initiating any project, a detailed review and approval process is conducted. This includes assessing the feasibility, profitability, risks, and alignment with business objectives. Terms and conditions of the contract are negotiated and finalized to protect both parties’ interests.

  1. Budgeting and Estimation:

Prepare a detailed budget for the contract that includes all direct costs (materials, labor, equipment) and indirect costs (overheads). Estimate timelines and resource allocations based on the project scope.

  1. Allocation of Costs:

Set up a job cost account for each contract where all related costs will be recorded. Directly allocate costs that can be directly attributed to the contract, such as specific materials and labor used on the job. Apportion indirect costs like overheads based on an equitable basis such as labor hours or machine hours used for the contract.

  1. Monitoring and Controlling Costs:

Regular monitoring of actual costs against budgeted costs to manage cost overruns. Implement control mechanisms to adjust resources or processes as necessary to stay within budget.

  1. Progress Billing and Revenue Recognition:

Use the percentage of completion method to recognize revenue, which involves calculating the proportion of the project completed during the accounting period and recognizing revenue accordingly. Prepare progress bills as per agreed milestones or based on the percentage of work completed.

  1. Managing Changes and Variations:

Handle any changes in the contract scope through change orders which must be approved by the client and incorporated into the contract terms. Adjust the budget and timelines accordingly.

  1. Cost Reporting and Analysis:

Prepare periodic cost reports detailing the costs incurred, revenue recognized, and profitability of the contract. Analyze variances between actual and budgeted figures to understand the causes and take corrective actions.

  1. Completion and Final Accounting:

Upon project completion, prepare a final account summarizing total costs, total revenue, and the profit or loss on the contract. Review any retention money or guarantees as specified in the contract terms.

  1. Post-Completion Review:

Conduct a post-completion review to evaluate the performance against the budget, the effectiveness of the costing procedures, and lessons learned for future contracts.

Challenges of Contract Costing:

  • Cost Overruns:

Managing costs within the estimates can be difficult due to unforeseen circumstances such as delays, changes in material prices, or underestimation of the original scope.

  • Revenue Recognition:

Determining the appropriate point at which to recognize revenue can be complex, especially with long-term contracts where progress needs to be accurately assessed and matched to revenue.

  • Estimation Accuracy:

Estimating costs and timelines accurately at the start of a contract is challenging but essential. Misestimates can lead to disputes or financial losses.

  • Managing Cash Flow:

Contracts often have staggered payment terms which can lead to cash flow issues, particularly if there are delays in certification or payment from the client.

  • Client Modifications:

Changes initiated by clients during the contract period can disrupt the workflow, leading to additional costs and needing re-negotiation of contract terms.

  • Subcontractor Reliability:

Reliance on subcontractors for completing certain tasks can introduce risks related to quality, timing, and cost control.

  • Regulatory Compliance:

Contracts must comply with numerous local, state, and federal regulations, which may change over the duration of the contract and necessitate adjustments in project management and costing.

  • Documentation and Tracking:

Maintaining detailed records of costs, progress, and changes for each contract requires meticulous documentation and tracking systems. Inadequate documentation can lead to financial discrepancies and difficulty in asserting claims.